Bin system optimized for coffee roaster

For the expansion of his production facility in Texas, an American coffee roaster called upon the SCE team for the engineering, production and assembly of his coffee silos. Good idea: customized work is SCE's (sorry) ‘cup of tea’.

Green and roasted beans side by side in one building

Modular custom fit

In a compact, rectangular building, SCE assembled 32 square bins in one block. This way, the process of the green and the roasted beans continues at the same location.

Fast as a percolator

After delivery, the cells were installed in just 8 weeks, within the predetermined timetable and budget. This to the satisfaction of the client.

How we operate